PROJECTS PRE-2005

  • Scorseby, Mitcham Frankston Bypass 2005 and present for John Holland. Drainage and bulk excavations Value $1.8 Billion project.
  • Pipe replacement GCCC QLD Coombabah 2005, 800 diameter mild steel pipeline.
  • Craigieburn water storage tanks 2004-2006 Yarra valley Water Value $1,000,000.00, detailed excavation and pipelines.
  • Dromana reservoir in 2004 for John Holland. ( Melbourne water) Value $9,500,000.00, bulk excavation and pipelines.
  • Mornington STP for in 2004 John Holland. (South East water) Value $21,000,000.00, bulk excavation and pipelines.
  • Whittlesea recycled water reservoir 2004 for Tenix. ( Yarra Valley water) Value $2,200,000.00 , bulk excavation and pipelines.
  • Regional rail project for John Holland 2004. Value $90,000,000.00, drainage and detailed excavation.
  • Colac STP in 2003 for John Holland. (Barwon Water) Value $1,200,000.00, detailed excavation, roads and pipelines.
  • Trentham reservoir upgrade 2003 Coliban Water. Value $1,800,000.00,detailed excavation and Mild steel pipelines.
  • Heathcote Vic Reservoir Upgrade 2003 for Colaban water. Value $1,800,000.00, detailed excavation and mild steel pipelines.
  • Next Gen Project in 2002 for Leighton Contractors. Value $3,100,000.00
  • Excavation on City Link Tunnel Victoria in 1997 to 1999 for Transfield Obeyashi. Open cut and tunnelling.

 

 

See our current projects and recently completed projects.